Shed slabs Brisbane: match the slab to the shed
For a shed slab, the useful starting point is the building footprint and what the shed will be used for. If supplier or engineering drawings already exist, send them with the enquiry so the slab is priced to the actual building detail rather than a generic rate.
The same-size slab can have a different scope depending on whether the shed is for light storage, cars, a workshop or heavy machinery.
Common shed and workshop slab jobs
The slab scope changes with the building use.
Garden / storage shed
Residential storage.
Useful information: Footprint, supplier requirements, access and base preparation.
Garage slab
Vehicle storage.
Useful information: Vehicle use, levels, drainage and dimensions.
Workshop slab
Home/trade workshop.
Useful information: Equipment/vehicle use, finish and service penetrations if relevant.
Acreage / machinery shed
Machinery and storage.
Useful information: Heavy vehicle use, apron, access and engineering.
Commercial shed / industrial unit
Business/workshop.
Useful information: Drawings, programme, loads and package scope.
What to send before pricing
1. Shed supplier, make or model if known.
2. Exact external dimensions.
3. Supplier slab/hold-down drawings if supplied.
4. Photos showing the site and access.
5. Whether excavation/base preparation is required.
6. Vehicle or machinery use.
7. Whether an apron or access concrete is required.
8. Target shed installation date.
What can move the final price?
Why the apron matters
A shed job may include more than the slab under the building. Ask whether the customer also wants vehicle access, an apron at roller doors, paths or external concrete around the structure.
BCG Shed Slab Enquiry
Shed slab FAQs
Should I send the shed supplier drawing?
Yes. If the supplier has provided slab or hold-down details, attach them so the contractor can price against the correct footprint and requirements.
What if the shed is not ordered yet?
Select Planning and provide the intended dimensions/use. The resulting price should be treated as budget guidance until the final building details are available.
Can the same contractor do the slab and external apron?
Often, but make the apron/access concrete a separate scope item so it is included clearly in the quote.